Mason Electrical Engineering Contractors have been operating for almost 40 years and during that time, we’ve had the opportunity to work on a range of process, infrastructure, materials handling and water treatment/delivery projects.
Here is a snapshot of some of our most recent projects.
Process/Infrastructure/Materials Handling Projects
Client
Project
Location
Contract Value
Scope of Work
CBH Site Expansion (2020)
Moora
$1.5M
Supply and install all electrical infrastructure including two new ground conveyor loading systems. Relocate the existing weighbridge.
CBH Site Expansion (2019)
Cranbrook
$2M
Supply and install all electrical infrastructure including three new ground conveyor loading systems and upgrading one existing conveyor.
CBH Throughput Enhancement Project (2019)
Salmon Gums, Arrino, Avon, Cadoux, Kojaneerup
$2.6M
5 conveyors installed at five separate sites across WA including remote locations. Upgraded the electrical assets and infrastructure to facilitate mechanical upgrades across each site
CBH Throughput Enhancement Project (2018)
Broomehill (x2), Kondinin, Kukerin (x2), Lake King, Mt Madden, Brazier Street (Esperance) (x2), Chadwick (Esperance), Beaumont (x2), Ongerup.
$4M
13 conveyors installed across nine sites spread across WA including remote locations. Upgraded the electrical assets and infrastructure to facilitate mechanical upgrades across each site.
Lake Varley MCC and SLO Supply and Build (2020)
Lake Varley
$300K
Design, build and install the CLS and MCC. Build and install SLO boxes. Build and install the Generator Disconnect Cubicle (GDC) for CLS power distribution. Interim power supply to site prior to the power upgrade. Design and deliver the Site Main Switchboard and Site Main Power upgrade.
Castrol SCADA installation (2019)
North Fremantle
$74K
Remove the existing manual IO system, replace existing PLCs, and consolidate everything into a new SCADA software package. Meet scheduled shut down timeframes to suit the client’s operations.
Fuel Storage and Dispensing Modules (2020)
Sandy Ridge
$80K
Supply and install electrical infrastructure and equipment
Fuel Storage and Dispensing Modules (2020)
Kemerton
$21K
Supply and install electrical infrastructure and equipment
Fuel Storage and Dispensing Modules (2020)
Rio Tinto’s Western Turner Syncline Site
$200K
Supply and install electrical infrastructure and equipment
Water Treatment and Delivery Projects
Client
Project
Location
Contract Value
Scope of Work
Water Corporation SCADA Obsolescence Project- Metro (2020-ongoing)
80 Sites across the Perth Metro Area
$1.05M
Instrumentation and SCADA upgrades for 80 sites
Water Corporation’s Beenyup Wastewater Treatment – Sludge Upgrade (2020)
Beenyup
$540K
Supply and install electrical infrastructure for the new sludge building including a new centrifuge.
Water Corporation SCADA Obsolescence Project – Midwest (2019-ongoing)
130 sites across the Midwest region
$1.3M
Instrumentation and SCADA upgrades for 130 sites.
Water Corporation SCADA Obsolescence Project – Goldfields and Agricultural (2019-ongoing)
120 sites across the Goldfields and Agricultural region
$1M
Instrumentation and SCADA upgrades for 120 sites.
Water Corporation’s
Murchison Water Improvement Project (2019-ongoing)
Mt Magnet, Sandstone, Cue, Meekatharra
$600K
Prebuild the water treatment module in Perth. Install EDR modules across four remote sites. Supply and install electrical controls and instrumentation to each site.
Rottnest Island Authority Parker Point Waste Water Pump Station Upgrade/Replacement (2019)
Rottnest Island
$137K
Design, build and install a new motor control centre (MCC).
Water Corporation’s Yerbillon Pump Station (2019)
Yerbillon
$50K
Supply and install four 355KW LV pumps and starters. Upgrade the starter circuits, PLC and motor controls.
Water Corporation’s Ravenswood Chlorination Plant Upgrade (2019)
Ravenswood
$30K
Supply and install electrical, instrumentation and control infrastructure.
Water Corporation’s Woodman Point Upgrade (2018-19)
Woodman Point
$70K
Supply and install a new centrifuge module
Water Corporation’s Denmark Water Treatment Plant Upgrade – Dewatering
(2018)
Denmark
$450K
Supply and install electrical, instrumentation and control infrastructure.
Rottnest Island Authority Longreach Waste Water Pump Station Upgrade/Replacement (2018)
Rottnest Island
$90K
Design, build and install a new motor control centre (MCC).
Water Corporation’s Karratha #2 Waste Water Pump Station (2018)
Karratha
$20K
Supply and install replacement electrical and control infrastructure.
Rottnest Island Authority Waste Water Treatment Plant Upgrade (2015)
Rottnest Island
$600K
Supply and install electrical, instrumentation and control infrastructure.