Projects

Mason Electrical Engineering Contractors have been operating for almost 40 years and during that time, we’ve had the opportunity to work on a range of process, infrastructure, materials handling and water treatment/delivery projects. 

Here is a snapshot of some of our most recent projects.


Process/Infrastructure/Materials Handling Projects


Client

Project

Location

Contract Value

Scope of Work

CBH Site Expansion (2020)

Moora

$1.5M

Supply and install all electrical infrastructure including two new ground conveyor loading systems. Relocate the existing weighbridge.

CBH Site Expansion (2019)

Cranbrook

$2M

Supply and install all electrical infrastructure including three new ground conveyor loading systems and upgrading one existing conveyor.

CBH Throughput Enhancement Project (2019)

Salmon Gums, Arrino, Avon, Cadoux, Kojaneerup

$2.6M

5 conveyors installed at five separate sites across WA including remote locations. Upgraded the electrical assets and infrastructure to facilitate mechanical upgrades across each site

CBH Throughput Enhancement Project (2018)

Broomehill (x2), Kondinin, Kukerin (x2), Lake King, Mt Madden, Brazier Street (Esperance) (x2), Chadwick (Esperance), Beaumont (x2), Ongerup.

$4M

13 conveyors installed across nine sites spread across WA including remote locations. Upgraded the electrical assets and infrastructure to facilitate mechanical upgrades across each site.

Lake Varley MCC and SLO Supply and Build (2020)

Lake Varley

$300K

Design, build and install the CLS and MCC. Build and install SLO boxes. Build and install the Generator Disconnect Cubicle (GDC) for CLS power distribution. Interim power supply to site prior to the power upgrade. Design and deliver the Site Main Switchboard and Site Main Power upgrade.

Castrol SCADA installation (2019)

North Fremantle

$74K

Remove the existing manual IO system, replace existing PLCs, and consolidate everything into a new SCADA software package. Meet scheduled shut down timeframes to suit the client’s operations.

Fuel Storage and Dispensing Modules (2020)

Sandy Ridge

$80K

Supply and install electrical infrastructure and equipment

Fuel Storage and Dispensing Modules (2020)

Kemerton

$21K

Supply and install electrical infrastructure and equipment

Fuel Storage and Dispensing Modules (2020)

Rio Tinto’s Western Turner Syncline Site

$200K

Supply and install electrical infrastructure and equipment

Water Treatment and Delivery Projects

Client

Project

Location

Contract Value

Scope of Work

Water Corporation SCADA Obsolescence Project- Metro (2020-ongoing)

80 Sites across the Perth Metro Area

$1.05M

Instrumentation and SCADA upgrades for 80 sites

Water Corporation’s Beenyup Wastewater Treatment – Sludge Upgrade (2020)

Beenyup

$540K

Supply and install electrical infrastructure for the new sludge building including a new centrifuge.

Water Corporation SCADA Obsolescence Project – Midwest (2019-ongoing)

130 sites across the Midwest region

$1.3M

Instrumentation and SCADA upgrades for 130 sites.

Water Corporation SCADA Obsolescence Project – Goldfields and Agricultural (2019-ongoing)

120 sites across the Goldfields and Agricultural region

$1M

Instrumentation and SCADA upgrades for 120 sites.

Water Corporation’s
Murchison Water Improvement Project (2019-ongoing)

Mt Magnet, Sandstone, Cue, Meekatharra

$600K

Prebuild the water treatment module in Perth. Install EDR modules across four remote sites. Supply and install electrical controls and instrumentation to each site.

Rottnest Island Authority Parker Point Waste Water Pump Station Upgrade/Replacement (2019)

Rottnest Island

$137K

Design, build and install a new motor control centre (MCC).

Water Corporation’s Yerbillon Pump Station (2019)

Yerbillon

$50K

Supply and install four 355KW LV pumps and starters. Upgrade the starter circuits, PLC and motor controls.

Water Corporation’s Ravenswood Chlorination Plant Upgrade (2019)

Ravenswood

$30K

Supply and install electrical, instrumentation and control infrastructure.

Water Corporation’s Woodman Point Upgrade (2018-19)

Woodman Point

$70K

Supply and install a new centrifuge module

Water Corporation’s Denmark Water Treatment Plant Upgrade – Dewatering
(2018)

Denmark

$450K

Supply and install electrical, instrumentation and control infrastructure.

Rottnest Island Authority Longreach Waste Water Pump Station Upgrade/Replacement (2018)

Rottnest Island

$90K

Design, build and install a new motor control centre (MCC).

Water Corporation’s Karratha #2 Waste Water Pump Station (2018)

Karratha

$20K

Supply and install replacement electrical and control infrastructure.

Rottnest Island Authority Waste Water Treatment Plant Upgrade (2015)

Rottnest Island

$600K

Supply and install electrical, instrumentation and control infrastructure.

Our Case Studies

View all

Latest News

Announcing our New Brand

With the launch of our new website, we’re very excited to unveil our new brand identity. Formerly known as MEEC, we will now be known by our full name of […]

read more

Our Clients