Moora Snapshot
- Scope: CBH Moora undertook a site expansion to facilitate greater grain storage and receivable input to site. The expansion included installation of 4 new storage bulk heads OBH 07/08 and OBH 09/10 and 2 new CLS/ground conveyors systems GC 04 and GC 05. Relocation of an existing weighbridge and removal and re-installation of existing area lighting.
- The electrical installation undertaken by Mason Electrical Engineering Contractors included a turn key electrical supply, installation and commissioning package:
- Installation of new SMSB
- Supply, installation and commissioning of two CLS MCC’s with associated power, control and control infrastructure
- Supply and installation of in-ground pits and conduits
- Supply and installation of new cable ladder, electrical control and communication cabling
- Supply and installation of site-wide communications infrastructure
- Undertake dry and wet commissioning to facilitate handover of asset to CBH Operations
- Team Size: 10 personnel
Project Value: $1.4 million
Cranbrook Snapshot
- Scope: As part of the 2019 Harvest Program a site expansion was undertaken at CBH Cranbrook. The expansion included the shortening of existing CLS ground conveyor OBH 06 and 07 including upgrade and re-installation of new electrical and control infrastructure.
- Upgrade an existing conveyor. Replace one SMSB, reroute the existing cabling and connect new submain cabling. Supply and install a second site main switchboard to provide power connections for the 3 new conveyors. Upgrade the communication network and systems. Integrate new and existing technology.
- The electrical installation undertaken by Mason Electrical Engineering Contractors included a turn key electrical supply, installation and commissioning package:
- Supply and installation of in-ground pits and conduits
- Supply and installation of new cable ladder, electrical control and communication cabling
- Supply and installation of site-wide communications infrastructure
- Undertake dry and wet commissioning to facilitate handover of asset to CBH Operations
- Team Size: 8 personnel
Project Value: $2.1 million
For both contracts Mason Electrical Engineering Contractors was Georgiou’s electrical contractor carrying out upgrade and expansion works at the CBH Sites.